Saturday, July 31, 2010

Things I Learned: The Last Project

  • Be Flexible. You can know where you want your lighting, but that doesn't mean that pipes, beams, etc. won't be in the way. You have to be flexible and know that it will look good regardless.
  • Label your light switches. Tell them up front what you want each switch to do.
  • Think about the future. We closed up all of the previous holes (they weren't electrical any longer - they moved it to where we needed it). However, i'll make sure to note where they are in case owners later (or us if we get rid of the pool table) want to add a fan. We know where it fits, where the support beam is, etc.
  • Have one person do the whole job. I'm SO glad I didn't piece meal to different vendors for painting, carpentry and lighting. It was great for the team to work together to get the job done and come when they were needed. The schedule changed a lot so if it had been different companies it would have been very frustrating. It was also nice to have one contact.
  • Get more than one quote. That's easy, but it really helped. I was able to get this one company to match a lighting quote from a different company, and to get them to match a carpentry quote from yet another company. Basically, I liked this company's painting quote and they matched on the others to do the whole job. Then they did extras, like painting our hall closet for $70 and putting crown in our half bath too for only $145. I hope I can use them again. Later, if we stay here longer, I could see adding crown to the 3 bedrooms upstairs and 2 bathrooms that lack it, and, when I can no longer stand the satin, i'd bring them on in a heartbeat to paint repaint the interior.
  • Get buy in. Austin was so supportive. We made the choices together with where lights would go, which lights we would buy (pendants) and worked with the vendor together, especially once they were on site.
  • Have a plan. We drew out the room in PowerPoint and indicated where we wanted 6" recessed cans, 4" recessed cans, pendants, etc. We got feedback from lighting peeps and adjusted based on their ideas. Before they came, we sent the diagram we all agreed on and when they arrived they had copies of it and we all knew which direction we were heading in.
I think that's it! Every project is trial and error but I always walk away feeling so much more knowledgeable and comfortable, though i'm never in the mood for another project for a while! LOL

Thursday, July 29, 2010

Before & After: Lighting, Painting & Crown Moulding Project...

BEFORE


AFTER



BEFORE


AFTER





BEFORE

AFTER


Three Words: I'm So Excited.

Three More: We Love It.

Three More: Hope You Do! :)

Three More: Reuben does too...

Wednesday, July 28, 2010

The Renovations Have Commenced...

I know I still owe a bunch on this blog - eek! But for now, know that the lighting has commenced - yay! I took some 'during' pictures last night. He was at the house from 3:30 until 9 p.m. He has cut 8 holes for the 8 6" cans so far and has run all of the wiring. He's arriving at 9 a.m. today to cut 5 more holes (for 3 more 6" cans and 2 more 4" cans) and to hang the 3 pendants. Then the lights go in... then the switches are fixed... i'm SO excited!

UPDATE: 12 p.m. Austin sent a few pics. NOTE: These were taken with a blackberry. Also, once the ceiling is white we think it will look SO much better! (so the cans will be flush)





UPDATE: 4 p.m. Austin sent another pic. Note: These were taken with a blackberry. Also, he insists that they just look close together due to the angle. We like.... eee!


Update: 4:40 p.m. Austin sent another pic

Thursday, July 22, 2010

Update on Lighting Project!

I signed a contract for our new house project! I'm still working on the date, but I have a remodeling company coming in to do the following:
  • remove 3 lights from our kitchen/seating area/pool table area (i.e. large rectangular room)
  • install 13 recessed lights and 3 pendant lights
  • patch/prime/paint the ceiling (currently tan- I want it WHITE)
  • paint our walk-in hall closet/mud room (currently white - I want it TAN)
  • Remove crown molding and install thicker crown in entire room.
That pool table light (and the track lighting in the kitchen and chandelier over the seating area are OUT!)
3 of these will be installed over the sink! (sink below!)
The curtain will be replaced with a bamboo roman shade and the three lights will hang above it. Note that dark ceiling and lack of crown - not for long!

I SO hope they can come and do it next week! I can't wait and think it's going to make a big impact!

Wednesday, July 14, 2010

Need to update...

Need to update this blog for:
  • New nightstands! Finally - woo! I'll take some pics.
  • New frames - got tons of new frames, had pictures printed, etc. - really think it makes the house more homey!
  • Austin's office - it's come a long way and we have a bit more to do - will post soon!
  • The Big Project: Lighting/painting/crown - this is coming along a bit slower than I want as I gather quotes, but I know that once I push the button we'll be good as done! Hope to get this done week of July 19 - 23 - we'll see!
  • Outdoor: I've been getting a lot done outside and it's really coming together! I'll take some progress pics once it's a bit farther along.
So yes, I have quite a few things to post about! Woo! Hope to post the nightstands this week!